top of page

*** Prices below are just generalizations.The actual price for any individual job may be higher or lower than the general prices mentioned below.***

Grading

Small Grading Jobs: $2K- $7K

- Time: 1 to 2 days of work
- Size: 1 acre or less yard/lot
- Import Material: Dirt/Clay/Topsoil (2 loads or less total)
- Export Material: Dirt/Clay/Topsoil (2 loads or less total)
- Machines: Skid Steer + Mini Excavator (if needed)


Medium-Sized Grading Jobs: $7K - $10K 

- Time: 1 to 5 days of work
- Size: 3 acre or less yard/lot
- Import Material: Dirt/Clay/Topsoil (5 loads or less total)
- Export Material: Dirt/Clay/Topsoil (5 loads or less total)
- Machines: Skid Steer + Mini Excavator (if needed)



Large Grading Jobs:  $10K +

Gravel Driveways

Small Driveway Repair: $2K- $7K
​
- Time: 1 to 2 days of work
- Size: 100 ft or less
- Import Material: Gravel/Crusher Run/Asphalt Millings (2 loads or less total)
- Export Material: Dirt/Clay/Topsoil (2 loads or less total)
- Machines: Skid Steer + Mini Excavator (if needed)
​
​
Medium-Sized Driveway Repair: $7K - $10K 
​
- Time: 1 to 2 days of work
- Size:  100ft - 200ft
- Import Material: Gravel/Crusher Run/ Asphalt Millings (5 loads or less total)
- Export Material: Dirt/Clay/Topsoil (3 loads or less total)
- Machines: Skid Steer + Mini Excavator (if needed)
​
​
Large Driveway Repair: $10K +
​
​
​
New Driveway Installs: $5K-$20K
-All details are job specific
​

Concrete & Asphalt Demo

Small Demo Jobs: $2K- $10K
​
- Time: 1 to 2 days of work
- Size: Driveways/Sidewalks/Patios/
Pools
- Haul Away: 3 Loads or less
- Machines: Skid Steer + Excavator (if needed)
​
Medium/Large Demo Jobs: $10k +
​
​
​

Land Clearing

Tree/ Brush Clearing: (Per Job Basis)

Dump Trailer Hauling

Delivery: $275- $350/ Load + Material Costs

- Maximum Capacity: 4 tons

 

Hauling Off/Removal: $275- $350/ Load + Disposal Fees (If Applicable)

 

- Maximum Capacity: 4 tons

 

bottom of page